Asphalt & Concrete Renovation Coating

Asphalt & Concrete Renovation Coating

One-coat color renewal for aged asphalt and cement pavements. High adhesion, no peeling, restores roads, lanes and parking areas to a uniform colored finish.

Model NC-AR100 · Waterborne acrylic-modified color-change coating · Single component, water-based, low VOC

Technical data

Solid Content45 ± 2%
Coverage0.20–0.35 kg/m² per coat *
Touch Dry (25 °C)30–60 min
Recoat Interval≥ 4 h
Full Cure7 days
Tensile Strength≥ 1.8 MPa
Adhesion (pull-off)≥ 1.0 MPa
Service Temperature-20 °C to 80 °C
ColorsGrey / Red / Green / Blue / Yellow, RAL on request

Indicative values for reference only — the formal TDS issued with your quotation governs. Values marked * have not yet been confirmed by the factory and must be verified before you specify or order.

Applications

  • Asphalt roads
  • Bicycle lanes
  • Parking lots
  • Pedestrian walkways
  • School & playground paving

Suitable substrates

  • Asphalt concrete
  • Cement concrete
  • Cement mortar screed

Packaging

  • 20 kg pail
  • 5 kg pail (trial order)
  • 1000 kg IBC on request

Application method

  1. Surface prep: sweep loose sand and dust; repair cracks and potholes; degrease oil stains.
  2. Priming: for highly absorbent or badly weathered pavement, dilute 10% water as bonding primer.
  3. Mixing: stir thoroughly until uniform; do not over-dilute beyond 5%.
  4. Application: spray or roller, 2 coats cross-applied; total wet film ≥ 0.6 mm.
  5. Curing: keep traffic off for 24 h; full chemical cure in 7 days.

Frequently asked

Will it peel off in hot summer or heavy rain?

No. The coating penetrates and bonds to the bituminous surface; adhesion ≥ 1.0 MPa with UV-stable acrylic resin. Give us the local climate data and we will confirm the suitable grade.

Can I apply it myself?

Yes. It is a single-component product applied by airless spray or roller. We provide method statements and video guidance for every order.

What is the MOQ?

One 20-ft container per color is standard; mixed colors within one container are accepted. Trial orders of 20–50 pails are welcome for first cooperation.

How long does the color last?

Typically 3–5 years before a maintenance recoat, depending on traffic load and sun exposure.

Ask about this product

Send the quantity, application area and destination port — we reply within one working day with pricing, TDS and sample options. Request a quotation or write to [email protected].